General Terms and Conditions

General Terms and Conditions

General Terms and Conditions for contracts for work and orders placed with O&L MasterDom s.r.o., Company ID No. 173 26 583, with its registered office at Moskevská 1464/61, Vršovice, 101 00 Praha 10, registered in the Commercial Register maintained by the Municipal Court in Prague, Section C, File No. 369976. Business premises and contact address: Podnikatelská 553, 190 11 Praha 9 – Běchovice.

 

Article I – Introductory Provisions

1. These General Terms and Conditions (hereinafter referred to as the “GTC”) govern the relationship between O&L MasterDom s.r.o. (hereinafter referred to as the “Contractor”) and its customer (hereinafter referred to as the “Client”) in connection with the performance of work, in particular construction work, renovations and turnkey projects, including the coordination of trades, electrical installations and the installation of technical systems.

 

2. These GTC become part of a contract if the contract, confirmed order or other offer to enter into a contract expressly refers to them and the Client has had a reasonable opportunity to familiarise themselves with them before the contract is concluded. For contracts concluded at a distance or outside business premises, consumers shall also be provided with these GTC in text form on a durable medium. The provisions of the contract or confirmed order shall take precedence over these GTC. In the event of a conflict between documents, the following order of precedence shall apply: the contract or confirmed order; variation orders and approved changes; the quotation and budget; these GTC; and the Complaints Procedure.

 

3. The Client may be a consumer, i.e. a natural person acting outside the scope of their business activities, or a business customer. Provisions which, by their wording, apply only to business customers shall not apply to consumers. Special consumer rights are set out in Article XI.

 

 

Article II – Quotation and Conclusion of the Contract

1. The Contractor’s quotation is valid for 30 days from its date of issue, unless stated otherwise in the quotation. If the purchase price of materials from suppliers increases by more than 5% before the contract is concluded, the Contractor may make an appropriate adjustment to the material prices in the quotation; the Contractor shall notify the Client of this before the contract is concluded.

 

2. Work with a price of up to CZK 100,000 excluding VAT may be agreed by means of an order confirmed by the Contractor. For projects with an anticipated price exceeding this amount, the Contractor normally requires a written contract for work. This does not preclude a contract from being concluded in another verifiable manner, in particular by confirmation of an order, by email or by electronic signature, provided that the content of the contract and the parties’ agreement are evident from their communications.

 

3. Contracts are concluded and orders confirmed on behalf of the Contractor by its managing director, a holder of a commercial power of attorney (procuration) acting within the scope of that authority, or another person authorised by the Contractor to carry out a specific legal act or a defined category of acts.

 

4. The quotation or contract shall state whether the price is agreed as a fixed sum, on the basis of a budget with guaranteed completeness, on the basis of a budget subject to a reservation as to its completeness, or as an estimate. Unless otherwise stated, the price is fixed once the contract is concluded and applies only to the expressly specified scope of work. For projects with a performance period exceeding 6 months, parties acting in the course of their business may expressly agree in the contract on adjustments to material prices in line with actual changes in prices. Any price change due to circumstances that could not have been foreseen when the contract was concluded shall be governed by the Civil Code; the Contractor shall notify the Client of the need for a price increase without undue delay after becoming aware of it.

 

 

Article III – Price, Additional Work and Omitted Work

1. The price of the work is specified in the contract or confirmed order and is based on the Contractor’s budget. Prices quoted to consumers shall always include VAT.

2. Prices excluding VAT shall be increased by VAT at the statutory rate. The reduced VAT rate applicable to housing shall apply only on the basis of the Client’s written declaration that the statutory conditions are met. The reverse charge mechanism under Section 92e of the VAT Act shall apply only where all statutory conditions are met, in particular where construction or installation work is supplied to a person to whom the obligation to account for the tax is transferred by law. The Client shall provide the Contractor with accurate information relevant to determining the applicable VAT treatment and rate.

 

3. The Client shall approve changes to the scope of work, additional work and omitted work before their implementation, in particular by signing a variation order or confirming approval by email, SMS, WhatsApp message, data box message or an entry in the construction site log. The approval must specify at least the scope of the change and its price or the method of calculating it.

 

4. Where the situation on site requires an immediate decision, the Client may also give an oral instruction for additional work to the person managing the work on behalf of the Contractor. The Contractor shall summarise the oral instruction in writing and send it to the Client without undue delay. If the Client is a business customer, the summary shall be deemed correct if the Client does not raise a specific objection within two working days and the circumstances clearly show that the Client requested the work or knowingly allowed it to be carried out. For consumers, the Contractor’s entitlement to payment for additional work arises upon the consumer’s verifiable confirmation, except in the case of work necessary to avert imminent damage.

 

5. Additional work shall be charged at the agreed price; if no price has been agreed, the unit prices in the budget shall apply, and where these are not applicable, the charge shall be based on the Contractor’s hourly rates communicated in advance and the materials actually used. The completion deadline shall be extended as appropriate where the additional work affects the progress of the work.

 

6. Without prior approval, the Contractor may carry out only work necessary to avert imminent damage or ensure safety. The Contractor shall inform the Client without undue delay of the reason for such work, its scope and its estimated price.

 

7. Persons identified in the contract, or persons whose authorisation has been communicated by the Client to the Contractor in writing, are authorised to request and approve changes to the work on behalf of the Client. The Contractor is not obliged to follow instructions from other persons.

 

8. Work charged by the hour, call-outs, transport and materials beyond the agreed scope shall be charged only if approved by the Client in accordance with this Article or if they relate to necessary work under paragraph 6. The rates specified in the quotation or contract shall apply; if the relevant rate is not specified, the Contractor shall communicate it to the Client before the change is approved.

 

 

Article IV – Payment Terms

1. Unless the parties agree on a different payment schedule in the contract or confirmed order, the Client shall pay the price as follows:

a) for a contract for work, 40% of the price as an advance payment following conclusion of the contract (to secure materials and commence work); thereafter, progress payments based on an itemised statement of work actually performed and materials supplied, submitted by the Contractor, normally upon reaching the milestones in the schedule, but at intervals not exceeding one month, so that the total payments made correspond to the value of the work performed and materials supplied, up to a maximum of 90% of the price; the remaining 10% of the price after handover of the work;

 

b) for an order, an advance payment equal to the price of the materials, but at least 30% of the price, upon confirmation of the order, and the balance after handover of the work.

The parties may agree on a different payment schedule; the terms of the contract or confirmed order shall take precedence.

 

 

2. Invoices and requests for advance payment are payable within 14 days of receipt by the Client, unless the contract states otherwise. The Contractor is not obliged to commence work or order materials until the advance payment has been credited to its account; the agreed deadlines shall be extended by the duration of the Client’s delay in making that payment.

 

3. In the event of late payment, the Contractor is entitled to statutory default interest and, in relation to business customers, also to reimbursement of debt recovery costs under Government Regulation No. 351/2013 Coll.

 

4. If the Client is more than 7 days late in making payment, the Contractor may suspend work until full payment is made, provided that the Contractor has first issued a written warning and an additional period of at least 3 working days has expired without payment. Deadlines shall be extended by the duration of the suspension and by a reasonable period needed to secure the required workers, subcontractors, equipment and materials again.

 

5. Following prior notice, the Contractor may also require reasonable security for payment or suspend work if it becomes apparent after the contract has been concluded that the Client will be unable or unwilling to meet a material payment obligation, in particular if the Client is overdue on another payment due to the Contractor. In relation to consumers, this provision shall apply only to the extent permitted by law and where there is a specific, substantiated risk.

 

6. If the suspension is caused by the Client’s breach of an obligation, the Client shall reimburse the reasonably incurred and documented costs of securing the construction site, transporting personnel and equipment off site and bringing them back, storage and subcontractor cancellation charges. In relation to consumers, these costs must be reasonable and foreseeable.

 

7. Materials supplied by the Contractor which have not yet been incorporated into the work shall remain the Contractor’s property until their price has been paid in full. The Client shall allow them to be stored separately and safely and shall not dispose of or otherwise deal with them without the Contractor’s consent. If the Client is late in making payment, the Contractor may remove materials that have not been incorporated, provided that this does not disproportionately interfere with the Client’s rights. Upon incorporation, the materials become part of the Client’s property; the Contractor’s right to payment remains unaffected.

 

8. If the Client is a business customer, the Client may set off its claims against the Contractor’s claims only with the Contractor’s prior written consent or where the Client’s claims have been acknowledged in writing by the Contractor or established by a final court decision.

 

9. If the Client is a business customer, minor defects and outstanding items that are recorded in the handover report and do not prevent use of the work entitle the Client to withhold, until they are remedied, only the portion of the price corresponding to the reasonable cost of remedying them; the balance shall be paid by the due date.

 

 

Article V – Performance of the Work and Cooperation

1. The Contractor shall carry out the work with due professional care, in accordance with the contract, applicable legislation and technical standards, using persons with the necessary professional qualifications. The Contractor may use subcontractors and shall be responsible for their performance as if it had performed the work itself.

 

2. The Client shall, in good time and free of charge, provide access to the place of performance, hand over the work site, provide electricity and water connections and space for storing materials, and provide the necessary permits, documentation and information about concealed utility lines and risks at the site. If the Client fails to provide this cooperation, deadlines shall be extended by the duration of the delay and the Contractor shall be entitled to reimbursement of reasonably incurred costs.

 

3. The Contractor shall notify the Client without undue delay if an instruction, supporting document or item supplied by the Client for the performance of the work is unsuitable. If such unsuitability prevents proper performance of the work, the Contractor may suspend work to the extent necessary until the instruction or supporting documentation is changed; deadlines shall be extended by the duration of the suspension. If the Client insists on its instruction despite a written warning, the Contractor shall not be liable for defects caused by that instruction. The Contractor shall not carry out an instruction if doing so would breach applicable legislation, a decision of a public authority or safety requirements.

 

4. If the Contractor discovers hidden obstacles while carrying out the work (e.g. the condition of existing utility systems or structures), it shall notify the Client and propose a change to the work; until agreement is reached, it may suspend the affected part of the work.

 

5. If part of the work is to be covered up or become inaccessible as the work progresses, the Contractor shall invite the Client to inspect it. If the Client fails to attend at the reasonable time specified in the notice, the Contractor may continue and document the covering-up by photographs or an entry in the construction site log. If the Client subsequently requests that it be uncovered and no defect is found, the Client shall pay the related costs and the deadline shall be extended.

 

6. Deadlines shall also be extended by any period during which the Contractor is unable to perform due to force majeure, adverse weather in the case of outdoor work, or measures imposed by public authorities.

 

7. The Contractor shall remove waste generated by its activities if its disposal is included in the budget, and shall keep the work site tidy. The Contractor is responsible for the safety of its own workers.

 

 

Article VI – Handover and Acceptance of the Work

1. The Contractor shall invite the Client to take over the completed work. A handover report shall be drawn up, recording any defects and outstanding work together with a deadline for remedying them.

 

2. In the case of a structure, the Client may not refuse to accept it solely because of isolated minor defects which, either individually or in combination with other defects, do not prevent the functional or aesthetic use of the structure or substantially restrict its use. Such defects shall be recorded in the handover report together with a deadline for their remedy.

 

3. The work is deemed accepted when the Client actually takes it over or signs the handover report. If the Client is a business customer, commencing normal use of the completed work without reservations after the Contractor has demonstrably invited the Client to accept it shall also constitute acceptance; this does not apply if the Client uses the work only to prevent damage, for testing, or because there is no reasonable alternative.

 

4. If the Client is a business customer and, without a valid reason, fails to attend the handover even on a replacement date set at least five working days after receipt of the second invitation, the Contractor may document the handover unilaterally by a report, photographs or a video recording. For the purposes of determining when the price becomes payable, the work shall then be deemed handed over upon expiry of that replacement deadline without the Client taking it over, provided that the work has been completed and is fit for the agreed use. This does not affect the Client’s right to report defects.

 

5. Together with the work, the Contractor shall hand over the documentation agreed in the contract, in particular inspection reports, manuals, warranty certificates and as-built documentation.

 

6. The risk of damage to the work passes to the Client upon handover.

 

 

Article VII – Liability for Defects and Warranty

1. The Contractor is liable for defects in the work in accordance with the contract and applicable legislation. The Contractor provides a warranty on the quality of the work performed for a period of 60 months from the date of handover of the work. The warranty covers defects in the Contractor’s workmanship, but does not cover defects, malfunctions or normal wear and tear affecting incorporated materials, products and equipment unless caused by defective workmanship. For incorporated materials, products and equipment, the Contractor shall pass on rights under any manufacturer’s warranty or facilitate their exercise, for the period and subject to the conditions specified by the manufacturer; the Contractor does not provide its own warranty as to their quality. This does not affect the Client’s statutory rights against the Contractor arising from defective performance.

 

2. The warranty does not cover normal wear and tear; defects caused by improper intervention by the Client or a third party, improper use or neglected maintenance (in the case of technical systems and equipment, failure to carry out maintenance in accordance with the manufacturer’s instructions); damage caused by external events; defects caused by materials or instructions supplied by the Client where the Contractor has warned of their unsuitability; or consumable parts (light sources, batteries, fuses and filters).

 

3. Complaints about defects shall be submitted in accordance with the Contractor’s Complaints Procedure, in particular by email to reklamace@olmasterdom.cz. The warranty does not affect the Client’s statutory rights arising from defective performance.

 

4. If the Client is a business customer, the Contractor’s total liability for pecuniary loss arising from any one contract shall not, in aggregate, exceed the price of the work excluding VAT. The Contractor shall not be liable for lost profits, loss of production, loss of business opportunity or other consequential economic losses. These limitations do not apply to harm caused intentionally or by gross negligence, harm to an individual’s inherent rights, or cases where the law does not permit such limitations, and do not apply to consumers.

 

 

Article VIII – Contractual Penalties (Applicable Only Between Businesses)

1. If the Client is a business customer, the Client is entitled to a contractual penalty for the Contractor’s delay in completing the work only if it has been expressly agreed in the contract or confirmed order. Periods of delay caused by the Client, a change in the scope of work, delays by the Client’s other suppliers, a hidden obstacle, force majeure or any other circumstance for which the Contractor is not responsible shall not count as delay on the Contractor’s part.

 

2. If the Client is a business customer and is late in making payment, the Contractor is entitled to a contractual penalty of 0.05% of the overdue amount for each day of delay, up to a maximum of 10% of the price of the work.

 

3. Payment of the contractual penalty does not affect the right to compensation for damage to the extent that the damage is not covered by the penalty. No contractual penalties are agreed with consumers; only statutory default interest applies.

 

 

Article IX – Withdrawal and Termination

1. The Contractor may withdraw from the contract if the Client is more than 14 days late in paying the advance payment or the price and fails to pay the outstanding amount within an additional reasonable period specified in a written demand, or if the Client fails to provide the cooperation necessary to perform the work despite a written request. No additional period need be granted if the Client’s conduct makes it clear that the Client will not fulfil its obligation, or where permitted by law.

 

2. The Client may withdraw from the contract if the Contractor is late in completing the work for reasons attributable to the Contractor and fails to complete it within an additional reasonable period granted by the Client, unless applicable legislation permits withdrawal without granting an additional period. This does not affect the Client’s statutory rights.

 

3. If the contract ends before the work is completed, the parties shall settle their mutual rights and obligations according to the reason for its termination and applicable legislation. If the contract ends for reasons attributable to the Client, the Client shall pay the price of the properly performed part of the work and the reasonably incurred costs of materials ordered exclusively for the work which cannot reasonably be used elsewhere or returned to the supplier; the Contractor shall hand over the materials paid for to the Client. The Contractor shall return any part of the payments received that exceeds its legitimate claims. If the contract ends because of a breach of the Contractor’s obligations, the Contractor’s entitlement to payment for performance already provided and the Client’s claims shall be assessed in accordance with applicable legislation. If the Client is a business customer and prevents performance of the work for reasons attributable to the Client, the Contractor is entitled to the agreed price less the amounts saved as a result of not performing the work. The consumer’s statutory right to withdraw from the contract under Article XI and the statutory rules for settlement remain unaffected.

 

 

Article X – Insurance, Personal Data and References

1. The Contractor maintains liability insurance covering harm caused in the course of its business activities, with a coverage limit of at least CZK 15,000,000.

 

2. The Contractor processes the personal data of the Client and the Client’s contact persons to the extent and for the periods specified in the Privacy Policy at www.olmasterdom.cz. Retention periods vary according to the purpose of processing, statutory record retention obligations and the period necessary to protect the Contractor’s rights.

 

3. The Contractor may take photographs of the work for the purposes of the project. The Client’s consent is required to publish photographs from which the Client or the Client’s property that is not open to the public can be identified, or to name the Client as a reference.

 

 

Article XI – Special Provisions for Consumers

1. Before the contract is concluded, the consumer shall receive clear and comprehensible information, in particular about the Contractor and its contact details, the main characteristics and scope of the work, the total price including taxes and charges or the method of calculating it, payment terms, the time and manner of performance, the rules governing complaints, warranty details, the duration and termination of the contract, the right to out-of-court dispute resolution and, where relevant, instructions on the right to withdraw from the contract, including a model withdrawal form. The specific information is set out in the quotation, contract or confirmed order together with these GTC and the Complaints Procedure. For contracts concluded at a distance or outside business premises, the Contractor shall provide the consumer with confirmation of the contract and the information required by law on a durable medium.

 

2. If the contract was concluded at a distance or outside the Contractor’s business premises, the consumer may withdraw from it without giving a reason within 14 days of its conclusion. This period is 30 days if the contract was concluded during an unsolicited visit by the Contractor to the consumer’s home or during an organised sales event. To withdraw, the consumer may use the model form provided in the appendix to these GTC or any other unequivocal statement.

 

3. The Contractor shall begin providing the service before the end of the withdrawal period only at the consumer’s express request made in text form. If the consumer withdraws before the service has been provided in full, the consumer shall pay a proportionate part of the agreed price for what has been provided up to the time of withdrawal, provided that the consumer was informed of this obligation in advance. Once the service has been provided in full, the consumer loses the right to withdraw only if performance began with the consumer’s prior express consent and the consumer acknowledged in advance that they had been informed that the right to withdraw would be lost upon full performance of the service.

 

4. If the contract was concluded during an unsolicited visit by the Contractor to the consumer’s home or during an organised sales event, the Contractor shall comply with the special statutory rules applicable to such contracts. This does not affect the rules governing urgent repairs or maintenance expressly requested by the consumer.

 

5. The right to withdraw shall also not apply in cases specified by law, in particular in the case of urgent repairs or maintenance carried out at a location designated by the consumer at the consumer’s express request; this exception does not extend to repairs other than those requested or to other goods supplied. The right to withdraw without giving a reason shall also not apply to a contract for the construction of a new building or substantial reconstruction of an existing building, where so provided by law. This exception does not automatically apply to ordinary repairs, renovations and installation work; the actual subject matter and scope of the contract are decisive.

 

6. The consumer is entitled to seek out-of-court dispute resolution. The competent body is the Czech Trade Inspection Authority, Gorazdova 1969/24, 120 00 Praha 2, adr.coi.gov.cz.

 

 

Article XII – Final Provisions

1. The version of the GTC in force on the date the contract is concluded shall apply to that contract. Subsequent changes to the GTC shall not apply to existing contracts unless the parties agree to them in writing.

 

2. The parties’ relationship is governed by the laws of the Czech Republic, in particular the Civil Code. If the Client is a business customer, the court having territorial jurisdiction over the Contractor’s registered office shall have jurisdiction.

 

3. Written communications shall be delivered to the postal and email addresses specified in the contract or order.

 

4. These GTC are published at www.olmasterdom.cz and take effect on 4 November 2026.

 

 

Appendix – Model Withdrawal Form